After a great deal of work and effort by Davrek Engineering Ltd of Eastbourne, East Sussex to build, the students from the Faculty of Engineering, Kingston University, London to assemble and USM Ltd at Trinity Buoy Wharf to deploy, the new ducted form of the Hales Turbine has been installed on the Thames. We are now ready to start the detailed development testing now that Environment Agency consent for the testing has been granted.
There is still a great deal of work to be done, fitting handrails, walkways etc and operating and test equipment to the turbine but we expect to be testing within the month.
No comments:
Post a Comment