Saturday, 28 September 2013

1124 NUTS & BOLTS LATER WE HAVE OUR TEST TANK

AMAZING THE NUMBER OF NUTS/BOLTS AND GASKETS  TAKEN TO ASSEMBLE THE SECTIONAL WATER FLOW TEST & DEMONSTRATION  TANK.
  THE NEXT FEW WEEKS WILL BE TAKEN UP WITH FILLING  AND TESTING  THE STRUCTURE BEFORE THEN BUILDING AND INSTALLING ALL THE INTERNAL FRAMING AND WATER FLOW DRIVE SYSTEMS. AND TEST EQUIPMENT NEEDED.




THE SPECIAL VIEWING WINDOW WILL ALLOW CLOSE OBSERVATION OF THE TURBINE UNITS AND ANY PROTOTYPE OPERATIONS AND ALSO ALLOW VIDEO RECORDINGS., ETC.