Monday, 4 April 2022

MAJOR MISTAKES IN UK GOVERNMENTS SEARCH FOR NETT ZERO CARBON

 

EVER TIME A MAJOR EVENT IN THE WORLD, SUCH AS THE UKRAINE INVASION OR EARTHQUAKE ETC, WHICH EFFECTS THE PRESENT BALANCE OF NATIONAL ENERGY  CONSUMPTION AGAIN AND AGAIN, SHAKING THE FINE BALANCE OF HOME PRODUCED POWER AND THAT THAT IS IMPORTED, PANIC SETS IN AND THE MAJOR ENERGY SUPPLIERS RAMP UP THE COSTS TO THE PUBLIC, BLAMING THE WORLD SPOT MARKET JUMP IN UNIT COST.

AGAIN, EVER TIME THIS HAPPENS, THE GOVERNMENT SHOUTS  LOUD ABOUT MAJOR CHANGES TO THE UK's ENERGY MIX WITH MORE GREEN SOURCES BEING USED.

 OIL AND GAS IS A FOSSIL FUEL, WHETHER IT IS DRILLED, FRACKED OR IMPORTED AND PRODUCES CARBON WHEN BURNED. IT IS NEVER GREEN

COAL, ESPECIALLY BROWN COAL IN GERMANY IS VERY HIGH IN POLLUTANTS  AS WELL AS CARBON. IT IS NEVER GREEN.

NUCLEAR, BIG OR SMALL IS THE MOST  EXPENSIVE, VERY LONG IN DESIGN AND BUILD TIME, AND DECOMMISSIONING CAN TAKE 40 YEARS, JUST THE SAME AS ALL THE NUCLEAR SUBMARINE IN PLYMOUTH AND ROSYTH STILL AWAITING THIS PROCESS.  

ALSO, AS THE TERRORIST THREAT FROM MAJOR PLAYERS LIKE ISIS ETC  WILL FIND THE MANY NEW NUCLEAR SITES AN EASY TARGET, ALL HAVING TO BE LOCATED CLOSE TO THE SEA OR MAJOR WATER WAYS THAT ALLOW AN ARMED GROUP TO ATTACK BY BOAT AND HOLD  LONG ENOUGH  WHILE A CORE MELT DOWN IS CREATED., THAT'S UNLESS AN SAS REGIMENT  IS STATION AROUND EACH ONE.

IT IS NEVER GREEN , SAFE OR ECONOMIC.

WIND POWER IS GOOD, PLENTY OF ROOM OFF-SHORE, OFF-SHORE SOLAR FARMS ARE BEING TRIALED.  BUT ONLY PART OF THE UK's NEEDS.

HOWEVER, FOR A NAUTICAL NATION WITH A GREAT PAST, IT IS AMAZING THAT THE POWERS TO BE HAVE NO UNDERSTANDING OF THE BASIC PRINCIPLES AND PROTOCOLS OF TIDAL STREAM, ESPECIALLY AS THE UK IS REGARDED AS THE BEST NATION IN THE WORLD WITH THIS RESOURCE.

  EVEN AFTER FACE TO FACE CHALLENGES WITH A GOVERNMENT MINISTER TO PUT HIS EXPERTS AGAIN OUR LONG TIME RESEARCHERS SUCH AS THOSE AT HALES WATER TURBINES LTD, THEY STILL HAVE NO UNDERSTANDING OF THE POTENTIAL OF LOW VELOCITY TIDAL STREAM FLOWS, THAT OCCUR IN 80% OF UK WATERS AND COULD SUPPLY ALL THE NATIONS ENERGY NEEDS.


A PERSONAL VIEW BY

PAUL HALES

DIRECTOR

HALES WATER TURBINES LTD

Monday, 21 March 2022

TIDAL TURBINES LTD

 

TIDAL TURBINES LTD 

   IS THE NAME OF THE NEW COMPANY CREATED TO TAKE OVER THE PROJECT PORTFOLIO OF HALES WATER TURBINES LTD.

.

 THIS NEW COMPANY , BASED IN DEVON WILL CONTINUE TO FURTHER DEVELOP THE LOW VELOCITY TIDAL STREAM HALES TURBINE AND HAVE FULL CONTROL OF LICENSING ETC.

THIS NEW COMPANY WILL BE HEADED UP BY RODNEY BROMFIELD,     PAUL HALES WHO HAS RETIRED WILL ACT AS A CONSULTANT WHEN REQUIRED.

WITH THE UK LOOKING TO BECOME SELF SUFFICIENT IN ENERGY,   IT WILL IN THE END HAVE TO LOOK TO HARVEST THE VAST AMOUNTS OF LOW VELOCITY TIDAL STREAM FLOWS, PROBABLY WITH SOME FORM OF INTER-LINK WITH THE PRESENT AND FUTURE OFF-SHORE WIND TURBINE UNITS BEING  SURROUNDED BY TIDAL STREAM AND WAVE DEVICES TO PRODUCE A COMMON AND ALL WEATHER CONDITION ENERGY SUPPLY.

Monday, 14 March 2022

HEAD OF HALES WATER TURBINES LTD RETIRES

 

 PAUL HALES,   MANAGING DIRECTOR AND FOUNDER OF HALES WATER TURBINES LTD IS TO RETIRE AFTER ALMOST 40 YEARS OF RESEARCH AND DEVELOPMENT  INTO SEVERAL FORMS OF TIDAL STREAM ENERGY TURBINES AND MARINE CRAFT PROPULSION SYSTEMS, IN BOTH THE UK AND USA.

    HIS PLACE WITH BE TAKEN UP BY RODNEY BROMFIELD, A SENIOR LECTURER   AT THE FACULTY OF ENGINEERING, KINGSTON UNIVERSITY, LONDON.

 THE OPERATION OF HALES WATER TURBINES LTD WILL ALSO BE MOVED TO DEVON, UK  IN THE NEXT FEW MONTHS.

 PAUL HALES WILL STILL SUPPORT THE FUTURE  R&D WORK OF HALES WATER TURBINES LTD AND ACT AS A CONSULTANT SHOULD HE BE NEEDED. 

   

Tuesday, 22 February 2022

WHEN IS RENEWABLE ENERGY NOT REALLY RENEWABLE ENERGY ???

 EACH DAY AND EVERY DAY, ENOUGH KINETIC ENERGY IS PRODUCED BY THE TIDAL MOVEMENT OF WATERS THROUGH THE ENGLISH CHANNEL AND NORTH SEA TO POWER ALL THE ENERGY CONSUMPTION OF THE THE UK  FOR A YEAR.   

EACH DAY AND EVERY DAY, ENOUGH THERMAL ENERGY IS PRODUCED BY THE EARTH'S CORE AN MILE BELOW GROUND LEVEL (DATUM LEVEL) UNDER THE UK THAT COULD BE CONVERTED TO USEFUL ELECTRICAL POWER, AGAIN TO POWER THE WHOLE COUNTRY MANY TIMES OVER.

OFF SHORE WIND IS EFFECTIVE, GIVEN THE WIND SPEED IS WITHIN THE OPERATING RANGE, BUT OF LITTLE USE DURING THE MANY WINTER HIGH PRESSURE WEATHER SYSTEMS AND SOMETIMES HAVE TO GO INTO SHUT DOWN TO SURVIVE STORM FORCE WINDS.  PROPOSED WAVE SYSTEMS HAVE ALSO GREAT POTENTIAL BUT HAVE TO OPERATE IN EVEN  HASHER OPERATING CONDITIONS TO SURVIVE. ALL RENEWABLES, BIO, SOLAR, HEAT PUMPS ETC ETC CAN BE EFFECTIVE  BUT  HAVE ISSUES AND DOWN PERIODS BUT WITH CAREFUL PLANNING ADD TO THE RENEWABLE ENERGY MIX REQUIRED TO ESCAPE FROM THE NOW OFTEN POLITICAL PRESSURES ON FOSSIL FUEL SUPPLY.

GERMANY IS A PRIME EXAMPLE OF FAILING TO EXPLORE ALL ENERGY ISSUES, BOTH SUPPLY AND CONSUMPTION BEFORE MAKING RADIAL NATION WIDE CHANGES.  GERMANY HAD ALREADY STARTED TO REDUCE THE LARGE USE OF BROWN COAL WHICH HAD HIGH POLLUTION ISSUES WHEN THE JAPANESE TIDAL WAVE DAMAGE TO THE FUKASHIMA NUCLEAR PLANT HAD THE GERMAN GOVERNMENT RAPIDLY PUSH TO CLOSE DOWN  THEIR OWN NUCLEAR PLANTS, WITHOUT AN ALTERNATIVE ENERGY PLAN IN PLACE ,LEAVING THEM GREATLY DEPENDENT ON  NATURAL GAS SUPPLIES FROM A FOREIGN COUNTRY ,  AS PRESENT DAY ISSUES SHOW IS A MAJOR PROBLEM.

THE UK IS BOTH RUNNING DOWN AND RUNNING OUT OF NATIONAL GAS AND OIL SUPPLIES AND THIS HAS RESULTED IN DEPENDENCE IN INTER-LINK POWER LINES WITH OFTEN NOT SO GENEROUS NEIGHBOURS. 

THE PRESENT UK GOVERNMENT POLICY IS TO  DESIGN AND PRODUCE MANY SMALLER FISSION NUCLEAR POWER STATIONS SPREAD AROUND THE COUNTRY TO OVERCOME THIS FUTURE SHORTFALL IN ENERGY PRODUCTION.

NUCLEAR POWER PRODUCTION IS NOT A RENEWABLE ENERGY SOURCE, IT IS A MAN MADE ENERGY PRODUCTION SYSTEM AND WHILE NUCLEAR FUSION MAY BECOME COMMERCIAL IS 20 -30 YEARS AND LEAD TO A CLEANER NON-RADIO ACTIVE PRODUCTION, THE PROPOSED SMALL FISSION NUCLEAR REACTORS WILL NOT ONLY BE A LOCAL AND NATIONAL RISK WHILE OPERATING BUT BE A DE-COMMISSIONING AND STORAGE BURDEN FOR THOUSANDS OF YEARS FOR THE NEXT GENERATIONS.

A GREAT MANY RENEWABLE ENERGY R&D COMPANIES AND ORGANIZATIONS ARE LEAVING THE RENEWABLE ENERGY FIELD OR GIVING UP DUE TO THE GOVERNMENTS LACK OF A WIDER VISION OF WHAT IS NEEDED AND WHAT CAN BE ACHIEVED.

THE PRESENT DAY'S VAST HIKE IN ENERGY PRICES TO THE BRITISH PUBLIC MAY JUST BE THE LEVER THAT OPEN'S THE GOVERNMENT'S EYES.

 

A PERSONAL VIEW 

FROM

PAUL HALES

DIRECTOR

HALES WATER TURBINES LTD

 



Monday, 7 February 2022

THE ENERGY WAR

 

THE PROBLEM

  THE WAR BEING FOUGHT OVER SUPPLIES OF ENERGY, IN ALL IT'S FORMS, IS A WORLD WAR AND WILL ONLY GET WORSE,  MUCH WORSE,  BEFORE IT FINALLY MOVES INTO THE NEW AGE OF LARGE SCALE HYDROGEN PRODUCTION AND THE WORLD LEADERS WHO HAVE ACCESS TO THE WORLD'S OCEANS AGREE TO ALLOW AND AID THE 44 COUNTRIES IN THE WORLD WITHOUT THAT CLEAR ACCESS  A WAY TO HAVE UNRESTRICTED CONNECTION PROTECTED BY UN CHARTER.

THE REASON FOR THE PROBLEM

VERY FEW GOVERNMENTS FULLY UNDERSTAND THE BASIC PRINCIPLES OF USABLE ENERGY, HOW IT IS PRODUCED AND STORED, EVEN IN THE  HIGH CONSUMPTION FOSSIL FUEL YEARS SINCE THE INDUSTRIAL  REVOLUTION WHEN COAL THEN OIL AND FINALLY GAS BECAME THE POWERING ENERGY  FORCES OF THE WORLD.

NOW, AS THESE FOSSIL FUELS ARE STARTING  TO BOTH REDUCE IN AMOUNTS SUCH AS GAS AND OIL AND ALSO THE GLOBAL EFFECTS OF CARBON EMISSIONS  HARM THE VERY STRUCTURE AND CLIMATE OF THE PLANET,  THE SLOW SEARCH FOR RENEWABLE AND SUSTAINABLE ENERGY IS ONLY NOW TAKING PLACE.

THE DANGERS OF PRESENT GOVERNMENT POLICY

  THE PRESENT GOVERNMENT POLICY HAS BEEN TO ALLOW MARKET FORCES TO CONTROL ENERGY SUPPLY.

 THIS LEAD TO THE FIRST MAJOR FUEL CRISIS IN THE 1970's WHEN THE OIL SUPPLIES FROM THE ARAB NATIONS WAS GREATLY REDUCED FOR POLITICAL REASONS CAUSING GREAT UPHEAVAL IN THE WESTERN NATIONS.

AGAIN, NOW , IN THE PRESENT DAY, AFTER THE SCARE OF NUCLEAR FALLOUT IN JAPAN DUE TO THE TIDAL WAVE, MANY COUNTRIES RAPIDLY PHASED OUT THEIR OWN NUCLEAR POWER PLANTS AND MADE THEMSELVES HOSTAGE TO FOREIGN POWERS, SUCH AS THE CASE OF GERMANY TO RUSSIA GAS SUPPLIES.

THE FUTURE PROBLEMS LOOKS EVEN WORSE

 AS RUSSIA FLEXES IT'S  MUSCLES WITH TREATS TO REDUCE GAS SUPPLIES TO EUROPE AND MANY GOVERNMENTS HAVE ALLOWED ENERGY STORAGE TO BE GREATLY REDUCED, SUCH AS THE UK, AGAIN BECAUSE OF MARKET COSTINGS RATHER THAN STRATEGIC NEEDS, THE ENERGY WARS WILL ONLY GROW WORSE.

WHY THE UK GOVERNMENT ENERGY POLICY IS WRONG

THE UK GOVERNMENT HAS NAILED IT'S COLORS TO THE MAST WITH OFF SHORE WIND AS ITS MAIN STAY, TO BE SUPPORTED BY YET TO BE DESIGNED SMALL SCALE NUCLEAR POWER PLANTS SPREAD AROUND THE COUNTRY.

OFF-SHORE WIND IS GOOD, IT WORKS, ITS UNDERSTOOD BY THE PUBLIC AND THE UK HAS ENOUGH TERRITORIAL WATERS TO SUPPORT LARGE DEPLOYMENTS.   HOWEVER, HAS BEEN SHOWN TIME AND TIME AGAIN, OFTEN VERY LARGE HIGH PRESSURE WEATHER SYSTEMS CAN AND DO LAY OVER THE WHOLE OF THE UK, REDUCING THE OUTPUT OF WIND FARMS, BOTH OFF SHORE AND LAND BASED TO LESS THAT 5% OF POSSIBLE RATED CAPACITY.

NUCLEAR POWER, BOTH LARGE SCALE OR THE PROPOSED SMALL SCALE LOCAL UNITS  ARE  BOTH A PRESENT DAY RISK FROM OPERATIONAL FAILURES SUCH AS THREE MILE ISLAND, CHENOBAL AND FUKASHIMA , ALSO FROM THE THREAT OF MAJOR TERROR ATTACKS FROM FANATICAL GROUPS  TO THESE VULNERABLE SITES THAT HAVE TO BE SITED CLOSE TO LARGE WATER SOURCES FOR COOLING, THEREFORE EASY ACCESS..    

  COUPLED TO THIS IS ALSO THE LEGACY FOR THE FUTURE GENERATIONS THAT WILL HAVE TO DE-COMMISSION THESE POWER PLANTS AND STORE THE RADIO-ACTIVE PARTS FOR THOUSANDS OF YEARS SOMEWHERE, WE ALREADY HAVE 20 NUCLEAR SUBMARINE SITTING IN UK HARBORS WAITING TO BE DE-COMMISSIONED WHICH WILL TAKE 20 - 30 YEARS PLUS.

THE UK ENERGY SOLUTION

OFF SHORE WIND FARMS ARE GOOD, SOLAR PANEL FARMS ARE GOOD (PROVIDE THE SOLAR SITES USE THE GROUND SPACE FOR SECONDARY USE SUCH AS ANIMAL GRAZING ETC).   BIO FUELS, HTA SYSTEMS FOR HEAT PUMPS  ETC  ARE GOOD,  HYDRO AND SEVERAL OF THE OTHER RENEWABLE RESOURCES ARE ALL GOOD AND ARE PART OF THE ENERGY MIX NEEDED.

WHAT THE UK GOVERNMENT IS MISSING

THE THREE MAIN RENEWABLE ENERGY RESOURCE, THAT THE UK HAS  IN ABUNDANCE ARE WAVE, TIDAL AND GEOTHERMAL.

WHILE EVEN A YOUNG SCHOOL BOY OR GIRL CAN TAKE A NEW IDEA FOR A WIND TURBINE TO THE TOP OF A HILL ON A WIND DAY AND PROVE THE CONCEPT, HOWEVER TO TEST, PROVE OR EVEN UNDERSTAND THE BASIC CONCEPT OF A TIDAL OR WAVE DEVICE IS A MAJOR CHALLENGE IN ITSELF.     APART FROM THE PHYSICAL CHALLENGES OF FINDING ACCESS TO WAVES TO WATER FLOWS IN A SAFE MANNER, THE MANY LEGAL  AND REGULATORY RULES AND CONTROLLING AGENCIES PREVENT SIMPLE DIP AND TRY METHODS, THEREFORE CREATING LONG DELAYS, OFTEN LARGE SUMS OF MONIES FOR PERMISSION AND INSPECTIONS, PREVENTING SO MUCH DEVELOPMENT.

WHAT THE GOVERNMENT NEED TO DO

INSTEAD OF UK GOVERNMENT DEPARTMENTS SITTING WAITING FOR THE PRIVATE SECTOR TO RAISE THE FUNDING TO EVEN PRESENT A POSSIBLE RENEWABLE ENERGY DEVICE OR PROCESS AS WELL AS DEAL WITH GOVERNMENT ORGANIZATIONS THAT HAVE NO UNDERSTANDING OF THE BASIC PRINCIPLES OR PROTOCOLS OF THE PROPOSED DEVICE.

THE UK GOVERNMENT SHOULD BE PRO-ACTIVE AND ACTIVELY SEEK  NEW AND POSSIBLE ENERGY SYSTEMS AND DEVICES THROUGH SCHOOL AND UNIVERSITY COMPETITIONS, SET UP SIMPLE SHORT TERM TEST SITES FOR EACH ENERGY SOURCE SO STUDENTS/COMPANIES CAN BRING ALONG PROTOTYPES FOR DISPLAY AND TESTING, IN THE HOPE TO ATTRACT ASSISTANCE AND FUNDING, SIMILAR TO THE BELGIUM GOVERNMENT DID DURING THE EU PRO-TIDE PROGRAM SEVERAL YEARS AGO, INSTEAD OF SITTING BACK AND WAITING FOR INDUSTRY TO DO THIS WORK,

I MYSELF HAVE STOOD FACE TO FACE AND CHALLENGED THE PRESENT MINISTER OF STATE FOR ENERGY, KWASI KWARTENG  MP , TO PUT HIS CHAMPIONS AGAINST MY CHAMPIONS TO PROVE HE WAS WRONG ON TIDAL STREAM TURBINES.  GIVE HIM HIS DUE, HE ALLOWED OUR COMPANY TO MEET HIM AND HIS PEOPLE IN LONDON AND WAS VERY POSITIVE ON THE POTENTIAL OF TIDAL STREAM ENERGY PROVIDE BY REACTION TYPE TURBINES SUCH AS THE HALES TIDAL TURBINE. 

HE DIRECTED HIS DEPARTMENT TO MAKE CONTACT. SADLY THEN THE PRESENT DAY GOVERNMENT  DEPARTMENTS ARE NOT SET UP TO UNDERSTAND NEW OR GROUND BREAKING DESIGNS AND HAVE NO SCOPE TO EVEN EVALUATE SIMPLY ANY IDEA THAT WILL BENEFIT THE UK, SO NO FURTHER WAY FORWARD HAS BEEN MADE.

A PRIVATE STATEMENT BY

PAUL HALES

DIRECTOR

HALES WATER TURBINES LTD




Friday, 21 January 2022

HALES WATER TURBINES LTD START MARKETING THE HTA FOR HEAT PUMPS

                                               THE NEW FLYER FOR THE HALES HTA.

 


HEAT TRANSFER ARRAY

                     THE DEVICE TO MAXIMIZE HEAT PUMP OUTPUT FROM WATER MOVEMENT

In the search for better cleaner, sustainable energy systems to both provide heating and cooling for buildings and dwellings, heat pump units are being promoted as a viable solution.  However, the primary heat source is the major factor in the efficiency of the whole heat pump system, and the new HALESHTA unit brings the best primary heat pump energy source -- MOVING WATER - to the growing heat pump market place.

This HTA unit is a heat pump energy source with a COP rating (coefficient of performance) above 6.0. The COP is the amount of useful heat as a ratio to the energy put into the system. This rating can be compared against air source at 2.8  ground source at 4.6 and static water at 5.2

 (see Kingston Heights heat pump system as example).

 

 


 

Each HTA contains the same 32mm HDPE x 250m of pipe-work as in the standard "Slinky " coils normally buried underground or stretched across lakes etc.It is designed for 50 year lifespan with 5 year replace or repair warranty. 100 % environmentally safe and 100 % recyclable with marine grade stainless steel framing etc, all within a 1.5m cube for 6kW output or 1.0m cube sized for 3kW output.

HTA SIZES  -   1.5 M CUBE FOR 6kW OUTPUT , 1.0 M CUBE FOR 3kW OUTPUT.

HTA WEIGHTS  -   1.5M CUBE UNIT - 358 kg,           1.O M CUBE - 216 kg

(size/material specs may change without notice but will retain 100% enviro requirements)

HTA PRICES       -   1.5M CUBE UNIT - £ 7600              1.0 M CUBE - £ 4850

Contact - Hales Water Turbines Ltd

email:-info@halesenergy.co.uk              or phone 07968594011  for details.(2018 patent  application).

Tuesday, 4 January 2022

HALES WATER TURBINES END TALKS WITH TIDAL SAILS AS

 

 AFTER SEVERAL LONG DISCUSSIONS WITH THE CEO OF TIDAL SAILS AS, A NORWEGIAN RENEWABLE ENERGY COMPANY WITH PATENTED TIDAL STREAM DEVICE THAT COMPRISED OF TWO FIXED VERTICAL SUPPORTS THAT CONTROLLED A STRONG CABLING SYSTEM CARRYING A LARGE NUMBER OF "SAILS" OR ANGLED BLADES  WHICH ARE DRIVEN BETWEEN THE VERTICAL SUPPORTS BY THE WATER FLOW TO PRODUCE USEFUL POWER.

A POSSIBLE  AGREEMENT TO WORK TOGETHER WOULD ALLOW TIDAL SAILS AS TO SEEK UK FUNDING FROM THE NEW FUNDS BEING DIRECTED TO UK TIDAL POWER DEPLOYMENT    .  HALES WATER TURBINES LTD WOULD USE ITS MANY YEARS OF TIDAL STREAM DEVELOPMENT AND TESTING TO  HELP AND IMPROVE THE TIDAL SAIL AS DESIGN AS REQUIRED.

AFTER CAREFUL EVALUATION OF THE TIDAL SAIL AS DESIGN, IT WAS FELT THAT SEVERAL MAJOR DESIGN PRINCIPLES HAD BEEN MISSED AND IT WOULD NOT BENEFIT FOR HALES WATER TURBINES LTD TO BE INVOLVED.

A SIMPLE CASE IN POINT IS THE USE OF "SKI LIFT" TYPE CABLE SYSTEM TO CARRY THE MAIN LOADING OF THIS TIDAL ENERGY  DEVICE.   IT IS A WELL KNOWN PRINCIPLE THAT WIRE FORM CABLES, WHICH CAN BE LUBRICATED AND PROTECTED IN "SKI LIFT " TYPE OPERATIONS,    SUFFER BADLY FROM THE SALT WATER CORROSION  AND ABRASIVE WORKINGS OF GRIT AND SUSPENDED PARTICLES AND WOULD REQUIRE  REPEATED REPAIR AND REPLACEMENT ( the primary reason that ship's have anchor chains and not cables)

WE WISH TIDAL SAILS AS THE BEST FORTUNE  IN THEIR DEVELOPMENT.

.